Bathroom Renovation: Update 2

I was afraid the next part of the renovation would coincide with the lyrics from the new Pompeii song, “And the walls came tumblin’ down…”

Luckily that wasn’t the case.

Since our last post when we gutted the place, we have been busy piecing things back together.

First, we had some wood to fix and studs to replace on the outside wall from over 50 years of water damage. Yikes!  Here a just a few pictures of that progress…

Once we had everything in we put new insulation in the wall and we also covered it with bath plastic for extra protection against water.

Then our contractor came to install the soaker jacuzzi tub from Lowe’s.  Yes, this big box had to go in that space.  Not sure how he did it, but he managed to do it without breaking anything! 🙂

Once the tub was in, we took down the old insulation that was in the ceiling and put in fresh stuff with an extra layer in the attic to warm the place up a bit.

Next, our contractor came back a couple of separate days to work on the plumbing and electrical (including installation of a ceiling fan.)  We had him switch the location of the vanity and the toilet so that we had more room in our small space.  We also had him change the location of the light switch and add more outlets.  We only had one outlet before!  That is a hair styling crime…

By the way, if you want an amazing fan get a Panasonic.  It sounds lame to want a great fan but it will do wonders against mold and water damage and it will be quiet as anything!

Plumbing and electrical: before (notice the LIVE WIRES TAPED TOGETHER…OMG!)


Plumbing and Electrical: After

Since we ended up changing the location of the toilet, there was some sub flooring we had to replace.  Once we did that, we were ready to put up the drywall!  If you’re doing this you should note to always start with the ceiling.  Why?  Well its the hardest part and it will also be easier to have clean lines once you go to put the walls up.

Thanks, Dad!

Luckily there was only ONE measuring error by yours truly.  It’s not that bad….right? Hehe 😉

Once the drywall was up, our contractor came back to mud the seams and install our new window.

Stay tuned for more blog postings as we get closer to the end of our renovation!  Next up: backer board installation and tile! Woohoo!

Have a question or comment on how we did something throughout the process?  Comment below!